Settling Foundation.
A homeowner called to see what could be done about a chimney that is moving away from the house.
Preparing for the Helical Pier System.
The soil is removed to expose the foundation footer to attach the pier.
Helical Pier System.
The steel piers are mechanically drilled into the ground until it reaches competent soil.
Helical Pier System.
A bracket is attached to the footer and the pier.
Helical Pier System.
An attempt will be made to raise the house to the original position, lift is not guaranteed. See a Certified Inspector for more details.